Ukraine seeks investment in energy construction projects (I) Kaniv PSPP Hydropower Station

2021-10-19
0

Industry: Energy and Chemical   Industry: Ukraine   Transaction Price: $ 1.523 billion Transaction Mode: Equity Financing

Project introduction

Project Name: Kaniv PSPP Project Construction.

Coordinator: Ukrainian Ministry of Energy.

Address: Cherkasy region, Buchak vllage.

Technical indicators:

● Capacity-1000 MW.

● hydroelectric generating set -4x 250 MW.

● Annual power generation-1.038 billion kilowatts per hour.

● Construction period -6.5 years.

Estimated total investment: USD 1.523 billion.

Financial details:

● Development Plan (DPP): 18 years.

● net present value (NPV): USD 491.8 million.

● Internal rate of return (IRR): 9.52%.

● Weighted average cost of capital (WACC): 5.41%.

Project phase/project status:

The first IP stage (basic design) in the three-stage design has been completed. This project has been approved by CMU DecreeNo. 1050-p on December 11, 2013.

Construction and installation permits have been obtained. The RD (detailed design) of the third stage (detailed three-stage design) is in progress. Detailed design documents are being prepared.

Social and economic effects/project advantages.

● Improve the country's energy independence.

● Improve the safety and flexibility of Ukraine's power system, and increase the hydropower generation by 10% in Ukraine (1.3 billion kilowatts per hour per year).

● Develop the infrastructure in Celka and create new employment opportunities for local people.

Low environmental neutrality, with little impact on the environment.

● It will help Ukrainian power company meet the requirements of frequency and active power control, so as to integrate into ENTSO-E, and create appropriate conditions for making full use of Ukraine's renewable energy potential.

Cooperation intention

The project is now seeking investment.