Industry: Minerals and Metallurgy Region: Asia Transaction Price: US $1million Method of transaction: Equity investment
Project unit: Xinjian Company. Since the mining right certificate has not been applied for for the time being, the partners of the project have registered a foreign invested company in Indonesia
Project Introduction: Based on the current situation of good gold price trend and high value, the project party chose the regional mining area in Indonesia considering the domestic policy constraints, and made further innovation in the traditional "cyanide piling" technology, mainly using cyanide to extract gold element.
Project status: the early stage of the party has invested has carried on the comprehensive survey and analysis work, and set up independent laboratories, and remand has a relevant formalities charge 100000 yuan, at present the core team are: geological analysis, hydrological surveying and mapping, chemistry experiment, and mechanical maintenance technicians, partner and founder of the project. Due to the epidemic, the team has withdrawn from Indonesia and returned to China. It is expected to return to Indonesia in March 2021 to start the project.
Project area: The mine is located in Nisi, India.
Mining area: Mining area is 140,000 square meters.
Operation mode: According to the transaction rules of the local market in Indonesia, when the project party starts to work in the mining area, there will be individuals or enterprises with demand to ask the price in the mining area. There are two kinds of products sold in this project, one is pure gold, the other is unfiltered gold adsorbed on activated carbon (with activated carbon sold together).
The advantage of project
1. Experience advantage: the project team and the technical team have many years of industry experience and strong ability to control the project.
2. Channel resource advantage: the project party has rich resource channels (upstream and downstream channels), numerous human resources, rich sales channels, stable downstream docking channels, and low project risk.
3. Technical advantage: the "geocyanide" method used in this project can extract 0.8g/m3 of gold in an efficient time. In addition to the heavy assets of mining equipment, the investment cost is very small, and the only need is to ensure the normal operation of the machine. And production, or profit, doubles after three months, lasting a year.
4. Advantages of the mining area: Through long-term investigation and verification, the geographical location of the mining area has the following conditions: constant high temperature, oxidation + volcanic rock fracture zone, and abundant water source, while only Indonesia's unique geographical location can meet the above three conditions at the same time. The technology used by the project side can be implemented with a high rate of return and a high payback cycle.
5. Market Advantage: At present, the gold market is stable and the price is rising. Besides, there are abundant resources around the mining area and numerous gold mines, so the mine has a good prospect and the project market space and potential are large.
6. Prospective Advantage: The overall level of gold production has increased significantly over the past decade, but with fewer and fewer major new discoveries, production levels are increasingly limited; At present, the price of gold products continues to rise, the gold concentrate market is in short supply.
Intention of cooperation: now the company is looking for domestic mergers and acquisitions or investment, please have the intention of the enterprise contact us.